OUR PROJECTS
No project too large or too small.
Pezzimenti Trenchless has been delivering high-quality results for more than 60 years, as our many satisfied clients can attest to.
From significant infrastructure projects and working with water authorities and major developers to smaller-scale assignments for local plumbers and drainers, we have extensive experience with jobs of all sizes and types.
ANGLE VALE STAGE 1 WATERMAIN WORKS
Description: The installation of a new 1085mm MSCL pipe encased with a mildsteel 1420mm O.D sleeve
Location: Curtis Road, Angle Vale, South Australia
Client: Leed Engineering
Length and ground conditions: 64m clay ground conditions
More photos
MT ATKINSON SEWER WORKS
Description: The installation of a new 376mm O.D GRP pipe microtunnelled along existing HV underground power
Location: Riding Boundary Road, Truganina, Victoria
Client: Califam Constructions
Length and ground conditions: 136m microtunnelled in one length in basalt
More photos
ALBERT PARK BRANCH SEWER
Description: The installation of a new 376mm O.D GRP pipe
Location: St Kilda Road, Albert Park, Victoria
Client: Jaydo Constructions
Length and ground conditions: 894m installed via microtunnelling through sandy clays and silty sands.
Bore lengths from 18m to 102m.
More photos
ELEY ROAD SEWER BRANCH DUPLICATION
Description: The installation of 427mm O.D, 501mm O.D and 616mm O.D GRP pipes
Location: Blackburn South, Victoria
Client: MFJ Constructions
Length and ground conditions: 900m installed via microtunnelling in siltstone ground conditions.
Bore lengths from 20m to 115m
More photos
MOONEE VALLEY RACECOURSE SEWER
Description: The installation of a new 376mm OD GRP Boss Pipe and 225mm Restraint PVC Pipe
Location: Moonee Valley Racecourse
Client: Adept Civil Group
Length and ground conditions: 500m of pipe installed in clay and sandy clay ground conditions.
More photos
DONNYBROOK RD EAST BRANCH SEWER
Description: The installation of a new 616mm OD GRP RCP Pipe
Location: Donnybrook
Client: MFJ Constructions and Yarra Valley Water
Length and ground conditions: 1100m installed through basalt rock up to 180mpa. Longest bore 150m.
More photos
SEVENTH BEND BRANCH SEWER
Description: The installation of a new 550mm OD GRP Hobas Pipe
Location: Seventh Bend Sewer, Melton South
Client: Pescatore Constructions
Length and ground conditions: 127m through basalt, drilling directly into existing concrete manhole.
More photos
KALOW SURREY HILLS
Description: The installation of a new 1100mm RC Jacking Pipe
Location: Under Union Rd, Surrey Hills
Client: The City of Boroondara
Length and ground conditions: 56m through fill and clay.